The sowing of the rice crop has been completed In the AoR (area of responsibility) of the subsidiary in Sveti Nikole. For irrigation of the rice fields, the flowing waters from the river Zletovska were taken and a few days afterwards, water was released from the Right Main Canal from the Bregalnica Hydro-system. This year, approx. 620 hectares have been sown with rice crops. Delivery of water for irrigation in the rest of the hydro-system started on 15 May 2021. The areas sown with clover, corn, cherry orchards etc started to be irrigated.

Rehabilitation and maintenance of the closed irrigation system is also underway. For the past two weeks 4 (four) ACC pipes with diameter ranging from F150 to F400 and 3 (three) repair joints, 2 (two) “zhibo” joints, 1 (one) PGS 400 B, 1 (one) PVC pipe F400 and a valve F200 were replaced and installed (see images attached).

Excavation and installation of pipe F400 Cadastral Municipality of Erdzeliya

1

Replacement of PGS 450, Cadastral Municipality of Mustafino

2

Installation of PVC pipe F 160, Cadastral Municipality of Lozovo

3

Dismantling and replacement of pipe F 250, Cadastral Municipality of Vrsakovo

 4

Field work in Modar Most, Cadastral Municipality of Krupishte

5

Excavation and installation of pipe, Cadastral Municipality of Krupishte

 6

Pipe excavation F 150, Cadastral Municipality of Mustafino

 7

Mounting of PGS hydrant

8