JSC Water Economy of Republic of  North Macedonia

No event in the calendar
Mon Tue Wed Thu Fri Sat Sun
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

Following field work, as per annual working plan for 2021 year, was carried out in the subsidiary of Yuzen Vardar situated in the town of Gevgeliya in the months of November and December respectively:

1. HMS (hydro-meliorative system) Valandovo
- maintenance of reconstructed system “Udovo – Valandovo”

1234


- cleaning of pools at the new pump stations
- cleaning of filters at the pump stations
- release of water from the pump station
- concluding contracts for delivery of water for irrigation of crops and delivery of invoices for irrigated areas
- maintenance of the old system Valandovo

5678

 - providing metal fence for “Straishte” pump station

2.HMS Konsko
- delivery of invoices for irrigated crops,
- repair of defect on pipe type "ACC 450 B"

910

-release of water from Tyrol water abstraction and cleaning of the Tyrol water abstraction

11

3.HMS Paljurci
- measurement, control of the dam level

1213

- management of shutters of the main pipeline
- control of irrigation of agricultural cooperatives

4. HMS Negorci – Prdejci
- concluding contracts for winter crops and delivery of invoices for irrigated areas
- cleaning of sieves and grids at the water abstraction on the Sermeninska river

 141516

- cleaning of sieves and grids at the water abstraction on the Kovanska river

1718

 

 

   

We use cookies

We use cookies on our website. Some of them are essential for the operation of the site, while others help us to improve this site and the user experience (tracking cookies). You can decide for yourself whether you want to allow cookies or not. Please note that if you reject them, you may not be able to use all the functionalities of the site.